国产精品码在线观看_免费毛片视频_在线播放一区二区_一级看片免费视频精品_成年av免费网站_草久热的视频在线观看_中亚洲文日韩一区_少妇白浆超级多无码_激情综合五月天激情综合_在线亚洲欧美日本专区

Popular keywords

contact us

National Service Hotline:

Email:Eva@szyas-tech.com.cn  Your inquiry will be responded in 1 day.

Suzhou Yashi Technology Co., Ltd

Contact: Mr. Miao

Mobile: + 86 13405116001

Tel: 0512-57688165

Email: Sales@szyas -tech.cm. cm

Address: No. 1, Zhenxing Road, Nanmo Town, Hai'an City, Nantong City, Jiangsu Province

current location: Home >> News >> Company news

Anticorrosion process flow and operation points of FRP storage tank

2022-05-09

There are great differences in construction methods between the anti-corrosion and thermal insulation of FRP storage tanks and the traditional anti-corrosion and thermal insulation of metal tanks. The construction is convenient, the work efficiency is improved, the cost is saved, and it is easy to master. Compared with the traditional construction methods, the application has great advantages. Anti corrosion construction process and material organization of FRP storage tank → pressure test and leakage test of storage tank → site investigation → scaffold erection → insulation layer construction → protective layer construction → scaffold removal.

1. Pressure test and leakage test of storage tank

Before the anti-corrosion and thermal insulation of FRP storage tank, organize personnel to conduct preliminary appearance acceptance of the storage tank, and conduct the strength and tightness test of the storage tank after checking that the appearance of the equipment is free of dead corner and leakage.

2. Material organization

Organize materials to arrive at the site according to the drawing requirements. All anti-corrosion and thermal insulation materials shall be provided with product certificate, indicating the production date and effective date, product quality inspection report, product standard, operation manual and product inspection report of this batch issued by the State Administration of quality supervision.

3. Site investigation

Be familiar with the construction site, select the material access road, stack the materials uniformly, and pay attention to rainproof and moisture-proof. The thermal insulation materials and galvanized iron sheet can be placed in the tank valve room under the FRP storage tank. Temporary electricity and water shall be taken nearby in the station.

4. Scaffolding

Scaffolds are built around FRP storage tanks. Since most storage tanks are located on the platform and the space is relatively narrow, the scaffold can be tied and fixed by making full use of platform guardrails, escalators and maintenance platforms. Since the tank maintenance platform has been constructed, the top of the scaffold pole does not need to be higher than the platform, and the first platform is about 1.5m away from the tank top.

5. Winding electric tropics

Due to the inevitable collision during the transportation and installation of FRP storage tanks, the manufacturer is required to repair the external wall of the storage tank locally before winding the electric belt. The electric heating belt on the tank wall is laid by winding from bottom to top, with a spacing of about 5cm. The tank top is laid radially. Each storage tank needs about 1800m electric heating belt. The laying of electric heating belt shall be carried out under the guidance of the manufacturer. After the construction of electric heating is completed, the remote meter shall be used to check whether it is a channel. The next procedure can be carried out only after the electric heating belt passes the heat test.


標(biāo)簽

Nantong Yashi New Material Co., Ltd